Use the correct destination
Riverside Park—the Taylor’s Wave site—is at 1630 Riverside Drive in Woodfin. Silver-Line Park and Pearson Bridge are different access points.
Open Riverside Park map ↗
TAYLOR’S WAVE · PARKING + ARRIVAL
Taylor’s Wave is open for use, while work on the wider Riverside Park project continues. Parking, routes and amenities can change; stay out of construction areas at all times. This page separates what exists now from what is planned for the finished park.
Use the lower park area for parking, then walk or paddle up to the wave. Construction areas are off-limits at all times, including evenings and weekends.
Work zones will move over the coming months, including into the original park for renovations. Follow current signs and barriers, and help alert anyone who enters a construction area.
Taylor’s Wave - Woodfin NC parking notice ↗ Posted and checked November 11, 2026. Recheck before visiting.
The Hill Street connection to Riverside Drive closed September 13, 2026 and is expected to remain closed through at least the end of 2027. If you normally approach Riverside Drive through Hill Street, live navigation may route you toward Clingman Avenue or Broadway instead. Use current navigation for the final route and follow posted detours; construction conditions can change. Last checked September 23, 2026.
During Wave Yard’s October 24, 2026 visit, a stair-free approach was observed, but it included bumpy, uneven ground. The viewing area was still unfinished. A continuous wheelchair-accessible route has not been verified. This October observation does not confirm today’s permitted route; follow current construction barriers.
Riverside Park—the Taylor’s Wave site—is at 1630 Riverside Drive in Woodfin. Silver-Line Park and Pearson Bridge are different access points.
Open Riverside Park map ↗Riverside Park is open after emergency repairs, but construction can temporarily change parking, routes and access. Check again on the day you visit.
Check current Town status ↗The expansion is planned to add parking, changing rooms, restrooms, spectator space and a new river-access ramp. Planned does not mean available today.
Do not block Riverside Drive, construction access or emergency routes. Follow on-site signs and move boats only from a legal, confirmed parking area.
For a one-way float, confirm the put-in, take-out, legal parking and return transportation before unloading.
Plan shuttles + boat storage →Parking availability alone does not answer route surface, slope, distance, restroom access or accessible viewing. Use the Accessibility Guide for the current known details.
Open the Accessibility Guide →Taylor’s Wave is open for use. The Town of Woodfin has lifted its ‘Stay out of Water’ advisory and says in-river construction is complete. Temporary closures may occur over the next few months for performance adjustments; check Town notices before visiting. The larger Riverside Park project has a separate timeline; broader park construction continues. Confirm parking, shore access and operating details with the Town before visiting. The park expansion’s closeout target remains July 2027. See the project timeline → Town’s official Wave update ↗ Opening update checked October 24, 2026.
GETTING THERE WITHOUT A CAR
There is not yet a continuous greenway connection from Asheville to Taylor’s Wave. Greenway search results can mix today’s paths with funded construction and future connections, so verify the whole route before relying on it.
Use only a route you can confirm is currently public and continuous. Riverside Drive traffic, construction and missing connections may make a route unsuitable for some riders or walkers.
Check Town project status ↗Buncombe County says the Riverside Drive/NC 251 design is being revised after Helene. The funded sections are expected around summer 2029; that timeline does not make them usable today.
Check Buncombe County greenways ↗About 0.41 mile near The Mill at Riverside and Elk Mountain Road was removed from the funded project. It remains a future connector, so the 2029 target should not be read as a promise of a complete greenway route from Asheville.
See the Town’s greenway timeline ↗Last checked September 20, 2026. Route conditions and project schedules can change; confirm before traveling.